



121 Foto
Lokasi
Las Vegas, NV
Las Vegas, NV
Penggunaan
34.279 mi
34.279 mi
Nomor seri
1M2AV04C7JM018415
1M2AV04C7JM018415
Loading...
Lot ini dilindungi oleh IronClad Assurance
Beli dengan yakin setelah mengetahui bahwa lot ini telah diperiksa lengkap dan terperinci oleh pemeriksa yang berkualifikasi.
Nomor ID
#15342443
Dalam yard
Ya
Menampilkan
Mack MP7 6 Cylinder 10.8 L Diesel 425 hp Engine, 2017 US EPA Label, Requires Diesel Exhaust Fluid, Air Conditioner, Cruise Control, Engine Brake, Eaton Fuller Manual Transmission, Differential Lock, Aluminum Wheels, 445/55R22.5 Front Tires, 12R22.5 Rear Tires, Spring Suspension, 239 in Wheelbase, 712.1 Pump Hours, Cable Remote Controls, Boom Light, Outrigger Pads
Catatan
<br><br> **We do not guarantee current registration or that this item will meet local emission requirements. Titles/titling docs may be delayed due to extended processing times at DMV.- </p> <br><p style="font-size: 16px; color:red;"><strong>TODAY'S PRICE: $100,000 <strike> $179,000 </strike> 44% OFF</strong> </p> <br><a href="/mpe-justreducedprices">Click here to shop for more discounted items</a>




























Serial Number / VIN
1M2AV04C7JM018415
Frame Stamp Serial Number/VIN Photo
Hour Meter / Odometer
34279 mi-No guarantees made as to actual hours/miles/kilometers; the inspection report reflects what can be visually observed.
Motor Vehicle Safety Standards Label
No
Paint
Sheet Metal (fiberglass) Condition
Steps/Ladders
Hand Rails
Glass
Exterior Lights
Operational
Steer Axle
Rear Axle
Rear Axle














Emissions Information
2017 US EPA Label, Requires Diesel Exhaust Fluid
Emission Label
A/C Compressor
Operational
Blow-by (subjective visual observation)
No noticeable vapor or pressure
Starter
Operational
Air Compressor
Operational
Fuel System
Operational
Exhaust System
Diesel Particulate Filter
Radiator
Oil Leaks
No dripping leaks
Fuel Leaks
No dripping leaks
Cooling System Leaks
No dripping leaks
Engine - Left Side
Engine - Right Side
DEF / AdBlue Tank
Limited Function Check
The engine started and ran.






















Mirrors
Window Controls
Both Manual
Seats/armrests
Seat Belts
Operational
Steering Control
Horn
Air horn operational, Electric horn operational
Oil Pressure
The gauge registers in the operating range. 30 PSI
Warning Lights
Operational, Check engine light stays on
Gauges
Operational
Gear Selector
Brake Control
Operational
Engine Brake
Not operationally checked
Clutch
Engages
PTO Control
Operational
ECM Miles
21300.6 ECM mi
Air Conditioner
Operational
Heater
Operational
Limited Function Check
The main components are in place and operational as noted.













Transmission
Operational
PTO Pump
Operational
Steer Axle
Front Drive Axle
Rear Drive Axle
Axle Bump Stops
Not all in place
Limited Function Check - Carrier
The drivetrain was operational without a load.
Steering Linkage
Steering Wheel Play
Brake Type
Air
Master Cylinder/Brake Control
Brake Lines/Hoses
Park Brake
Held against power, Stopped the machine while rolling
Limited Function Check - Brakes
The brake system functioned, stopping and holding the machine.
Springs/Hangers Condition
Frame Condition
Tire Condition
Wheel Condition
Wheel Studs















Pumps (Hydraulics)
Hydraulic Motors
Valves
Hydraulic Tank
Hoses (Hydraulic)
Swing Motor
Boom Cylinders
Pump Cylinders
Lift Cylinders
Limited Function Check
The hydraulic system was operational.












Pump Unit Serial Number
KCP40ZX5170-144
Pump Cell:
510
Pump Hours
712.1 Pump Hours
Main Boom - Conveyor
39.6, 35.6
Wear Pads
Raise / Lower Mechanism
Hydraulic raise
Support Frame
Turntable Bearing
Impact Idlers in Hopper Area
Remote Control














Outrigger Condition
Remote Control
Operational
Boom Condition
Boom Pipe
Receiver/Hopper
S Valve Wear Parts
Agitator
Concrete Pump Cylinders
Turntable Bearing
Water Tank
Not operationally checked
Water Pump
Not operationally checked
Rear Body Steps
Body Decks and Sideboards



Compressor
Oil Separator
Valves, Hoses and Piping
Limited Function Check - Air Compressor
The compressor builds air pressure.
Oil Sample Analysis
| engine | |
|---|---|
| date of analysis | Jul 14, 2026 |
| Silicon | 0 PPM |
| Tin | 0.37 PPM |
| Silver | 0.06 PPM |
| Aluminum | 0.2 PPM |
| Chromium | 0.21 PPM |
| Lead | 1.24 PPM |
| Copper | 1.62 PPM |
| Nickel | 0.44 PPM |
| Iron | 8.52 PPM |
| Glycol | NEG |
| Water | NEG |
| Fuel | <5% |
Item harus dibayar penuh pada Rabu, 08 Januari 2031. Biaya keterlambatan akan dikenakan setelah tanggal jatuh tempo.
Bawa peralatan Anda ke tempat yang seharusnya dengan solusi logistik dan pengiriman layanan lengkap Ritchie Bros. Kami mengurus setiap langkah perjalanan dengan layanan lengkap kami untuk membawa peralatan Anda melintasi negara, benua, dan lautan dengan cepat dan efisien
Informasi peralatan secara detail memiliki ruang lingkup yang terbatas, dan Ritchie Bros. Auctioneers belum memeriksa aspek atau komponen peralatan selain yang secara tegas ditetapkan di sini. Kecuali dinyatakan secara tegas, kami tidak membuat pernyataan atau jaminan, baik secara tersurat maupun tersirat, mengenai peralatan atau komponennya, termasuk namun tidak terbatas pada pernyataan atau jaminan apa pun mengenai fungsionalitas, kesesuaian, atau kepatuhan terhadap standar keselamatan atau persyaratan otoritas atau badan pengatur yang berlaku, kesesuaian untuk tujuan tertentu, atau kelayakan jual. Sangat disarankan untuk melakukan inspeksi mandiri secara detail terhadap peralatan sebelum melakukan penawaran.
Peralatan tidak diuji dengan beban atau dioperasikan dalam seluruh gigi persneling. Kami tidak membuat pernyataan atau jaminan bahwa peralatan akan beroperasi sesuai dengan spesifikasi produsen. Tidak ada pemeriksaan yang dilakukan sehubungan dengan aspek fungsionalitas apa pun, selain yang secara jelas disertakan di sini. Hanya foto terpilih yang disediakan untuk setiap komponen undercarriage, dan mungkin tidak menunjukkan kondisi undercarriage secara keseluruhan.
Ukuran disediakan hanya untuk tujuan perkiraan. Dimensi muatan secara aktual dapat berbeda, berdasarkan tinggi truk/trailer dan konfigurasi/posisi alat berat yang dimuat. Pembeli bertanggung jawab untuk mengukur seluruh beban sebelum meninggalkan situs pelelangan kami untuk memastikan muatan aman untuk diangkut. Semua ukuran harus diverifikasi oleh pembeli. Jangan mengandalkan ukuran ini untuk tujuan transportasi.